Phosphate and powder painted containers line – Euroimpianti
Model Power coating plant, year of manufacture 2011
Power burner installation for the tunnel: 200.000 Kcal/h
Power burner installation for the drying oven: 380.000 Kcal/h
Fuel: Gas Methane
Electric power installation:
1. For the tunnel: 14 kW
2. For the drying Oven: 3 kW
3. For the Coating Booth: 15,5 kW
4. For the Curing Oven: 4 kW
5. For the Overhead conveyor: 1,5 kW
Mains (V-Hz): 220/380-50
Pressure to the burner: 20 mbar
Water from network: 2 bar
Dried compressed air: 7 bar
Automatization:
Reind Automazionioni, type SL120, Year 2011
Fire control center: GM Electronics, type GM826SD
2 tanks:
1. Tank for Phosphodegreasing
Capacity 3.500 liter
2 pumps each 4kW
1 burner RBL Gulliver/Riello RS50
2. Tank for Washing
Balo9uac
Capacity 1600 liter
1 pump 4 kW
Powder painting: traditional technological cycles
Automatic Powder painting
Pretreatment
Metal parts travels along a tunnel at a constant speed passing in different stages of chemical treatment and washing / rinsing in a hot or ambient temperature water.
Drying
Metal parts travel along a ventilated oven at a constant speed until the surfaces get completely dry.
Painting
Metal parts are painted with the electrostatic guns in the spray booth. When is required there’s also a possibility to install manual stations for the retouching.
Polymerization
Painted metal parts go into the polymerization oven, which is equipped with a bell-shaped or air curtains devices in order to avoid the dispersion of heat. Normally the paint solidifies at about 200°C.
Aditional pictures upon request!
Price Euro 124.000 Euro + VAT, FCA Romania